by webmaster_WBTBC | Jan 7, 2026
Wright Brothers was selected to be the Design-Builder for a school music hall and classroom addition for the STEAM public charter MOSAICS school in Caldwell, Idaho. The 3,200 SF new building houses the music and band classroom. The goal was to design and construct a...
by webmaster_WBTBC | Jan 7, 2026
After completing the original school in 2018, Wright Brothers was once again selected to be the design-builder to complete a $3 million, 7,200 SF addition to the St. Ignatius school in 2024. The addition included two separate buildings. The first includes 4 separate...
by webmaster_WBTBC | Jan 7, 2026
The Money Metals Depository in Eagle, Idaho is a groundbreaking facility that has reshaped the landscape of precious metals storage, both regionally and nationally. Much more than a secure vault: it’s a large-scale economic engine and a pillar of Idaho’s...
by webmaster_WBTBC | Jan 7, 2026
Delivered as a Design-Build project, this improvement included the design and installation of a new synthetic turf field tailored to the District’s athletic programs, branding, and usage needs. Scope of work encompassed removal of the existing natural grass field and...
by webmaster_WBTBC | Jan 7, 2026
Wright Brothers was selected as the Design-Builder for the replacement of the Emmett High School football field, completed in advance of the 2025–2026 school year. The project team collaborated closely with the District to deliver a multi-sport facility serving both...